Oak Brook, IL · DuPage County
Tent/Membrane Structure Requirements
This checklist lists required documents and safety information for people submitting General and Electric Permit forms for an outdoor tent or membrane structure.
What this form is
Submit this checklist with the attached General and Electric Permit forms when seeking a permit for a tent or membrane structure. It asks for items such as a site plan, a floor plan, and other required documents or information, and lists requirements for access, electrical connections, tent placement, fire safety, and severe weather. Outdoor Dining Area Tent permits are valid for 180 days from issuance.
Who needs it
Anyone submitting General and Electric Permit forms for a tent or membrane structure should include and check off the required documents and information listed.
How to submit it
Submit it to the city department named on the form; check the city website for current contact details.
About notarization
This document is signed without a notary; the signer just signs and dates it.
How to submit this form
- 1
Download The Checklist
Download the Tent/Membrane Structure Requirements checklist.
- 2
Review And Check Off Requirements
Check off the required documents and information listed on the checklist.
- 3
Gather Required Plans
Prepare the requested documents, including a site plan and floor plan.
- 4
Submit With Permit Forms
Submit the checklist and required items with the attached General and Electric Permit forms.
Frequently asked questions
- What is the Tent/Membrane Structure Requirements checklist for?
- It lists documents and information to submit with the attached General and Electric Permit forms, along with requirements for tents and membrane structures.
- What documents and information are requested?
- The checklist calls for a site plan and, among other items, a floor plan. It also lists requirements for electrical connections, tent placement, fire safety, and severe weather.
- Do I need a notary for the Tent/Membrane Structure Requirements checklist?
- No. This document is signed without a notary; the signer just signs and dates it.
- How do I submit the tent structure requirements checklist?
- Submit it with the attached General and Electric Permit forms to the city department named on the form; check the city website for current contact details.
Need something notarized?
This Tent/Membrane Structure Requirements doesn’t need a notary — but Illinois residents can notarize other documents online with a commissioned online notary.
