Demolition Permit Application

Property owners or contractors use this application to request a City of Vandalia permit before demolishing a structure.

What this form is

The application requests details about the demolition site, owner, contractor, and utility-related contractors, along with the cost of the improvement and water service disconnect. The form says a permit is issued only after applicable fees are paid, and demolition requires a prior water system disconnect performed by the city. It also describes required plans and plat information and lists demolition regulations and inspection steps.

Who needs it

A property owner or contractor planning to demolish a structure in Vandalia should complete this application and follow its listed requirements.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

This application is signed and dated without a notary; it lists no notarized attachment or sworn step.

How to submit this form

  1. 1

    Download The Application

    Download the Demolition Permit Application PDF.

  2. 2

    Complete The Application

    Fill in the demolition location, owner and contractor details, contractor information, and the listed cost fields.

  3. 3

    Gather Plans And Plat Information

    The application refers to plans and a plat diagram showing the lot and the structure and outbuildings to be demolished.

  4. 4

    Submit To The City

    Submit the completed application to the city department named on the form; check the city website for current contact details.

Frequently asked questions

Do I need a notary for the Demolition Permit Application?
No. The application has signature and date lines but no notary block; it lists no notarized attachment or sworn step.
How do I submit the Demolition Permit Application?
The form does not give submission instructions. Submit it to the city department named on the form; check the city website for current contact details.
What information does the demolition application request?
It requests the demolition location, owner and contractor details, information about plumbing, excavation and electrical contractors, landfill details, and the cost of the improvement and water service disconnect.
What steps does the form list before demolition?
The regulations say to contact the city to schedule a final meter reading and disconnect, arrange a pre-demolition inspection, and ensure utilities are disconnected by their providers.

Need something notarized?

This Demolition Permit Application doesn’t need a notary — but Illinois residents can notarize other documents online with a commissioned online notary.