Property owners or applicants use this application to request a building permit for a commercial or residential project in Bourbonnais.

What this form is

The Village of Bourbonnais Building Department application requests project and owner information, a detailed scope of work, and contractor details by trade. Submit it for a commercial or residential building project; include a plat of survey and two complete sets of drawings when applicable. For ground disturbance on property of one acre or more, the form requires a signed and sealed SWPPP prepared by an Illinois Licensed Engineer.

Who needs it

Property owners or their agents or applicants seeking a commercial or residential building permit in Bourbonnais should complete this application.

How to submit it

Submit the completed application to [email protected], as directed on the form. Include a plat of survey and two complete sets of drawings if applicable.

About notarization

This application is signed and dated without a notary; the form requires no sworn or notarized attachment, only the required signatures and dates.

How to submit this form

  1. 1

    Download The Application

    Download the Building Permit Application PDF.

  2. 2

    Complete The Application

    Provide project, owner or applicant, scope-of-work, and contractor information; select commercial or residential.

  3. 3

    Gather Required Attachments

    Include a plat of survey and two complete sets of drawings if applicable. Include a signed and sealed SWPPP when required by the form.

  4. 4

    Submit To The Village

    Email the completed application and applicable attachments to [email protected].

Frequently asked questions

Who uses the Bourbonnais Building Permit Application?
Property owners or their agents or applicants use this application to request a commercial or residential building permit in Bourbonnais.
What should I include with the application?
The form calls for a plat of survey and two complete sets of drawings if applicable. For ground disturbance on property of one acre or more, include a signed and sealed SWPPP prepared by an Illinois Licensed Engineer.
Do I need a notary for the Building Permit Application?
No. This application is signed and dated without a notary, and the form does not require a sworn or notarized attachment.
How do I submit the Building Permit Application?
Email the completed application to [email protected], as directed on the form, with applicable required attachments.