Sun River Terrace, IL · Kankakee County
Utility Shed Permit Application
Sun River Terrace property owners or authorized agents use this application to request a permit for a utility shed smaller than 200 square feet.
What this form is
This application requests a building permit for a utility shed under 200 square feet and includes shed regulations, a worksheet, and a wall section. The application asks for owner, property, project, and contractor information. Submittals must include a plot plan, the worksheet, wall-section or manufacturer details, and other listed project documents.
Who needs it
Property owners or authorized agents planning a utility shed under 200 square feet in Sun River Terrace should complete and submit this application.
How to submit it
Submit it to the city department named on the form; check the city website for current contact details.
About notarization
This application is signed without a notary; no attachment or related step is identified as sworn or notarized, so the owner or authorized agent signs the authorization.
How to submit this form
- 1
Download The Application
Download the Utility Shed Permit Application for a shed smaller than 200 square feet.
- 2
Complete The Application
Complete the owner, property, project, and contractor information sections, and sign the authorization as the owner or authorized agent.
- 3
Gather Required Documents
Prepare the plot plan, worksheet, wall section or manufacturer specifications, stamped truss design, and other listed submittal items.
- 4
Submit To The City
Submit it to the city department named on the form; check the city website for current contact details.
Frequently asked questions
- Do I need a notary for the Utility Shed Permit Application?
- No. The application calls for the owner or authorized agent to sign the authorization, but does not identify a notary or any notarized or sworn attachments.
- Who completes the utility shed permit application?
- The application says the owner or authorized agent completes Sections 1 and 6 and signs the authorization. It is for a utility shed smaller than 200 square feet.
- What documents are required with the application?
- The listed submittal items include a plot plan, shed permit worksheet, wall section or manufacturer specifications, stamped truss design, necessary project drawings, contractor list, and signed contract or material estimate.
- How do I submit the utility shed permit application?
- Submit it to the city department named on the form; check the city website for current contact details. The form lists a plot plan and other project documents as submittal requirements.
Need something notarized?
This Utility Shed Permit Application doesn’t need a notary — but Illinois residents can notarize other documents online with a commissioned online notary.
