Bannockburn, IL · Lake County
Level I Architectural Review Commission Application
Property owners and applicants use this application to request Level I architectural review for proposed construction, alterations, enlargements, or remodeling in Bannockburn.
What this form is
The Village of Bannockburn uses this application for Level I Architectural Review Commission review of proposed property work. Applicants provide property, owner, and project information; describe the improvements; answer an interest question; and certify the application. The packet also includes a submittal checklist, floor area information sheet, and zoning table. Required materials vary by project, and Building Permit approval is required before work starts.
Who needs it
Property owners or authorized applicants proposing work in Bannockburn that requires Level I Architectural Review Commission review should complete this application.
How to submit it
Email the initial PDF plan set to Ryan Mentkowski at [email protected]. Hand deliver the application fees; submit the checklist and required project documents with the application.
About notarization
This document is signed and dated without a notary; it includes no sworn or notarized attachment, so the applicant and owner just sign and date it.
How to submit this form
- 1
Download The Application
Download the Level I Architectural Review Commission Application and its included checklist and supporting sheets.
- 2
Complete The Application
Enter the property, applicant, owner, and project details, answer the interest question, and sign and date the certifications.
- 3
Gather Required Materials
Use the checklist to gather project documents, such as plans, a site plan or survey, and applicable fee or escrow materials.
- 4
Submit To The Village
Email the initial PDF plan set to Ryan Mentkowski and hand deliver the application fees with the submittal.
Frequently asked questions
- Do I need a notary for the Level I Architectural Review application?
- No. The application has signature and date lines for the applicant and owner, but no notary block or notarized attachment.
- How do I submit the Level I Architectural Review application?
- Email the initial PDF plan set to Ryan Mentkowski at [email protected]. Hand deliver the application fees and submit the checklist and required project documents.
- What materials are listed for Level I review?
- The checklist lists a work description, floor area calculation, zoning data table, site plan or survey, plans, and other items depending on the project. The Village may require additional documents.
- Can I start work after Level I approval?
- No. The application states that separate Building Permit approval is required before starting work.
