Building Permit Application

Property owners or contractors use this application to request a building permit and provide details about the property and proposed construction.

What this form is

Use this application to request a permit for proposed construction, additions, or alterations in Chenoa. It asks for property and owner information, construction type, structure dimensions, estimated start date and cost, and distances from lot lines. A drawing or sketch showing the location of existing and new structures is required; the form also notes that an additional form is required if a contractor is being used.

Who needs it

Property owners or contractors seeking a permit for construction, an addition, or an alteration in Chenoa should complete this application.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

This document is signed without a notary; the applicant or contractor just signs and dates it.

How to submit this form

  1. 1

    Download The Application

    Download the Chenoa Building Permit Application PDF.

  2. 2

    Complete The Form

    Fill in the property, owner, construction, structure, and setback information, then sign and date the application.

  3. 3

    Gather The Required Drawing

    Include a drawing or sketch showing the location of existing and new structures. If using a contractor, the form says an additional form is required.

  4. 4

    Submit To The City

    Submit the application to the city department named on the form; check the city website for current contact details.

Frequently asked questions

Do I need a notary for the Building Permit Application?
No. This application is signed without a notary; the applicant or contractor signs and dates it.
What information does the Building Permit Application ask for?
It asks for property and owner details, construction type, structure dimensions, estimated start date and cost, and setbacks from lot lines.
What should I attach to the Building Permit Application?
Include a drawing or sketch showing the location of existing and new structures. The form says an additional form is required if a contractor is being used.
How do I submit the Building Permit Application?
The form does not provide submission instructions. Submit it to the city department named on the form, and check the city website for current contact details.