Hoopeston, IL · Vermilion County
Building Permit Application
Hoopeston’s building permit application collects project and property details from owners or contractors applying for a permit for construction work.
What this form is
Use this application to request a building permit for work at a Hoopeston property. It asks for the work-site address, owner and contractor information, construction costs, subcontractor details, and the scope and type of work. The form requires two sets of building plans and photos showing the front, back, and sides of the work site, and states that concealed mechanical work and framing must be inspected before covering.
Who needs it
Property owners or contractors planning construction work in Hoopeston can complete this application and provide the requested plans and site photos.
How to submit it
The form lists 301 W Main St., Hoopeston, IL 60942, and says checks are payable to City of Hoopeston; it does not specify a submission method.
About notarization
This application is signed and dated without a notary; it asks for no notarized or sworn attachment, so the applicant just signs and dates it.
How to submit this form
- 1
Download The Application
Download the Building Permit Application PDF.
- 2
Complete The Application
Fill it out completely in print or type, including the work-site, owner, contractor, cost, and project information.
- 3
Gather Plans And Photos
Include two sets of building plans and photos showing the front, back, and sides of the work site.
- 4
Submit To The City
The form lists 301 W Main St., Hoopeston, IL 60942, and says checks are payable to City of Hoopeston.
Frequently asked questions
- Do I need a notary for the Building Permit Application?
- No. The application has a signature and date line but no notary block, and it asks for no notarized or sworn attachment.
- How do I submit the Building Permit Application?
- The form lists 301 W Main St., Hoopeston, IL 60942, but does not state how to submit the application. It says checks are payable to City of Hoopeston.
- What should I include with the application?
- The form calls for two sets of building plans and photos of the proposed work site showing the front, back, and sides of the property.
- What information does the application request?
- It requests the work-site address, owner and contractor contact details, construction costs, subcontractor information, structural details, type of use, and scope of work.
