New Milford, IL · Winnebago County

No notary required

Zoning Permit / Building Permit Application

Property owners or lessees use this application to request a Village zoning permit for proposed construction, such as an addition, fence, deck, or storage building.

What this form is

The application collects owner or lessee, contractor, architect, property, construction type, and proposed-use information for a Village zoning permit. Applicants must attach a drawing showing lot dimensions, yard setbacks, building dimensions and square footage, and the proposed structure’s distance from property lines. The form states that a building permit may be obtained from the Winnebago County Building Department.

Who needs it

A property owner or lessee proposing construction such as an addition, fence, deck, or storage building should complete this application for a Village zoning permit.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

This document is signed and dated without a notary; the signer declares the application and attached information correct.

How to submit this form

  1. 1

    Download The Application

    Download the New Milford zoning permit / building permit application PDF.

  2. 2

    Complete The Form

    Fill in the applicant, property, construction, and proposed-use information requested on the application.

  3. 3

    Attach The Required Drawing

    Attach a drawing showing lot dimensions, setbacks, building dimensions and square footage, and the proposed structure’s distance from property lines.

  4. 4

    Sign And Submit

    Sign and date the application, then submit it to the city department named on the form; check the city website for current contact details.

Frequently asked questions

What does the New Milford zoning permit application ask for?
It asks for applicant, property, contractor, architect, construction type, and proposed-use details, plus an attached drawing of lot dimensions, setbacks, buildings, and distances to property lines.
Do I need a notary for the New Milford zoning permit application?
No. The application has a signature and date line, but no notary block. The signer declares the application and attached information correct.
How do I submit the New Milford zoning permit application?
The form does not give submission instructions. Submit it to the city department named on the form; check the city website for current contact details.

Need something notarized?

This Zoning Permit / Building Permit Application doesn’t need a notary — but Illinois residents can notarize other documents online with a commissioned online notary.