Dimondale, MI · Eaton County

No notary required

Zoning Application

Dimondale property owners or authorized agents use this application to request zoning transmittals, site plan reviews, special use permits, or other zoning actions.

What this form is

Use this application to request a zoning transmittal, site plan review, special use permit, or another zoning action in Dimondale. It asks for applicant and property details, the proposed work and use, and zoning measurements; applicants must provide a sketch plan or attach an engineer or architect site plan or survey. The form includes a fee list for several application types, including a no-charge zoning transmittal.

Who needs it

Property owners or authorized agents seeking a zoning review, permit, or other listed zoning action in Dimondale should complete this application.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

This application is signed and dated without a notary; the form asks for a sketch or an attached site plan or survey, with no sworn attachment stated.

How to submit this form

  1. 1

    Download The Application

    Download the Dimondale Zoning Application PDF.

  2. 2

    Complete The Form

    Enter applicant and property information, describe the proposed work and use, and complete the applicable zoning details.

  3. 3

    Prepare The Plan

    Provide the requested dimensioned sketch, or attach an engineer or architect site plan or survey.

  4. 4

    Sign And Submit

    Sign and date the application, then submit it to the city department named on the form; check the city website for current contact details.

Frequently asked questions

What is the Dimondale Zoning Application used for?
It is used to apply for a zoning transmittal, site plan review, special use permit, or another zoning action. The application collects applicant, property, proposed work, and proposed use details.
What plans or drawings should I include?
Provide a sketch showing lot, building, and setback dimensions, street names, and a north arrow. Instead of the sketch, you may attach an engineer or architect site plan or a survey.
Do I need a notary for the Zoning Application?
No. The application asks for the applicant's signature and date, not notarization. It requests a sketch or an attached site plan or survey, and does not state that any attachment must be sworn.
How do I submit the Zoning Application?
The form does not give submission instructions. Submit it to the city department named on the form; check the city website for current contact details.

Need something notarized?

This Zoning Application doesn’t need a notary — but Michigan residents can notarize other documents online with a commissioned online notary.