Leslie, MI · Ingham County

No notary required

Commercial Electrical Permit

Commercial property owners or their authorized agents use this application to request an electrical permit from the City of Leslie Building Department.

What this form is

This application requests a commercial electrical permit and collects the job location, owner and contractor details, service rating, building size, and work description. Plans and an application for plan examination are required before a permit can be issued for work that does not meet the listed exceptions. The form includes a fee schedule, and projects requiring plan review are assessed a plan review fee.

Who needs it

Commercial property owners or authorized agents seeking an electrical permit for work in Leslie should complete this application.

How to submit it

Submit the completed permit to the City of Leslie Building Department, 602 W Bellevue, P.O. Box 496, Leslie, MI 49251. Make checks payable to City of Leslie Building Dept.

About notarization

This permit is signed and dated without a notary; the agent or contractor completes the affidavit and signature section.

How to submit this form

  1. 1

    Download The Permit

    Download the Commercial Electrical Permit application for Leslie.

  2. 2

    Complete The Application

    Enter the job, owner, contractor, service, building, and work details, then sign and date the form.

  3. 3

    Gather Required Plans

    Include plans and an Application for Plan Examination with the appropriate fee when required.

  4. 4

    Submit To The City

    Submit the application to the City of Leslie Building Department at the address printed on the form.

Frequently asked questions

Do I need a notary for the Commercial Electrical Permit?
No. The document has no notary block. The agent or contractor completes the affidavit and signature section and dates the form.
How do I submit the Commercial Electrical Permit?
Submit it to the City of Leslie Building Department at 602 W Bellevue, P.O. Box 496, Leslie, MI 49251. Make checks payable to City of Leslie Building Dept.
When are plans required with this permit application?
Plans are required for building types outside the listed exceptions. The form says plans and an Application for Plan Examination, with the appropriate fee, must be submitted before a permit can be issued.
What information does the application request?
It asks for the job location, owner and contractor information, service rating, building size, description of work, and other project details.

Need something notarized?

This Commercial Electrical Permit doesn’t need a notary — but Michigan residents can notarize other documents online with a commissioned online notary.