Saranac, MI · Ionia County

No notary required

Sign Permit Application

The Sign Permit Application is for applicants seeking approval to construct, install, or use a sign regulated by the Village of Saranac zoning ordinance.

What this form is

The Village requires this application to be completed and approved by the Zoning Administrator before construction, excavation, or use of a regulated sign begins. It asks for applicant, property, tenant, and contractor information; sign details, dimensions, lighting, location, and setbacks; and a site plan. Required attachments include a sign sketch or rendition, a building-front photo or drawing, a site plan, and owner authorization.

Who needs it

Applicants proposing a sign regulated by the Village of Saranac zoning ordinance need this application approved before beginning related construction, excavation, or sign use.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

This application does not require a notary; the applicant and applicable owner or tenant sign and date it, and no sworn or notarized attachment is listed.

How to submit this form

  1. 1

    Download the Application

    Download the Sign Permit Application PDF.

  2. 2

    Complete the Application

    Provide applicant and property details, describe the proposed sign, and fill in its location, dimensions, lighting, and setback information.

  3. 3

    Gather Required Attachments

    Prepare the sign sketch or rendition, building-front photo or drawing, site plan, and owner authorization.

  4. 4

    Submit the Application

    Submit it to the city department named on the form; check the city website for current contact details.

Frequently asked questions

What is the Sign Permit Application for?
It gives the Village of Saranac information about a proposed sign and requests Zoning Administrator approval before regulated construction, excavation, or sign use.
What attachments does the application require?
Include a sketch, drawing, or computer rendition of the sign with specifications; a photo or drawing of the building front; a site plan; and owner authorization.
Do I need a notary for the Sign Permit Application?
No. The application is signed and dated by the applicant and applicable owner or tenant; it lists no sworn or notarized attachment.
How do I submit the Sign Permit Application?
Submit it to the city department named on the form; check the city website for current contact details.

Need something notarized?

This Sign Permit Application doesn’t need a notary — but Michigan residents can notarize other documents online with a commissioned online notary.