Center Line, MI · Macomb County

No notary required

Application for Permit to Construct Within the Right-of-Way

Applicants and contractors use this application to request permission to construct, repair, or install a structure within Center Line’s right-of-way.

What this form is

Use this application to request permission to construct, repair, or install a structure within a Center Line right-of-way. It asks for the location, construction dates, activity description, applicant contact and identification information, and a signature. Attach a map, plan, specifications, bond, and proof of insurance as applicable; the application lists possible permit and inspection fees without stating amounts.

Who needs it

Applicants seeking to construct, repair, or install a structure within a Center Line right-of-way should complete this application.

How to submit it

The application says plans, specifications, maps, and statements are filed with the Department of Public Works, and that all permits require its approval. It does not provide a submission address or method.

About notarization

This application is signed and dated without a notary; it identifies no sworn or notarized attachment or related step.

How to submit this form

  1. 1

    Download the Application

    Download the Right-of-Way Permit Application PDF.

  2. 2

    Complete the Application

    Enter the project location, construction dates and description, applicant information, and signature and date.

  3. 3

    Gather Attachments

    Attach a map, plan, specifications, bond, and proof of insurance as applicable.

  4. 4

    Submit to the City

    File the application materials with the Department of Public Works; the document states that all permits require its approval.

Frequently asked questions

What is the Right-of-Way Permit Application for?
It requests permission to construct, repair, or install a structure within a Center Line right-of-way and sets out conditions for the work.
What attachments does the application list?
The form lists a map, plan, specifications, bond, and proof of insurance as attachments. The application also describes performance and cash bonds that may be requested.
Do I need a notary for the Right-of-Way Permit Application?
No. The application has a signature and date line but no notary block or notarized attachment; the signer signs and dates it.
How do I submit the Right-of-Way Permit Application?
The document says application plans, specifications, maps, and statements are filed with the Department of Public Works, and all permits must be approved by that department. It gives no submission method.

Need something notarized?

This Application for Permit to Construct Within the Right-of-Way doesn’t need a notary — but Michigan residents can notarize other documents online with a commissioned online notary.