Sterling Heights, MI · Macomb County
Homeowner Shed & Garage Permit Packet
Homeowners use this packet to apply for a building permit for a shed or garage and provide the plans and details required for review.
What this form is
The packet explains that sheds larger than 50 square feet require a building permit; sheds of 50 square feet or less do not require one but must meet location requirements. Applicants provide a building permit application and plans showing the proposed location, dimensions, height, door width, and a picture of the shed. The guide also lists construction details and additional requirements for larger projects.
Who needs it
Homeowners proposing a shed or garage that requires a building permit can use this packet to prepare an application and required plans.
How to submit it
Submit online at www.sterlingheights.gov, in person at the Building Department, or by mail to Attn: Building Department, 40555 Utica Rd., Sterling Hts., MI 48313.
About notarization
This packet is signed and dated without a notary; the homeowner affidavit requires the homeowner’s signature, but the document does not call for notarization.
How to submit this form
- 1
Download The Packet
Download the Homeowner Shed & Garage Permit Packet and review its rules and requirements.
- 2
Complete The Application
Complete the building permit application sections. Homeowners may skip the contractor information.
- 3
Gather Required Plans
Prepare plans showing the proposed location and required shed details, and include a picture of the proposed shed.
- 4
Submit To The City
Submit online at www.sterlingheights.gov, in person at the Building Department, or by mail to the address listed in the packet.
Frequently asked questions
- Do I need a notary for the Homeowner Shed & Garage Permit Packet?
- No. The packet is signed without a notary. It includes a homeowner affidavit that requires the homeowner’s signature, but does not call for notarization.
- How do I submit the shed or garage permit packet?
- The packet says to submit online at www.sterlingheights.gov, in person at the Building Department, or by mail to the Building Department at 40555 Utica Rd., Sterling Hts., MI 48313.
- When does a shed require a building permit?
- The packet says a shed larger than 50 square feet requires a building permit. A shed of 50 square feet or less does not require a permit but must meet location requirements.
- What plans should I include with the application?
- Include plans showing the shed’s location, distance from property lines, dimensions or construction details, and a picture of the proposed shed. The packet provides further plan requirements.
Need something notarized?
This Homeowner Shed & Garage Permit Packet doesn’t need a notary — but Michigan residents can notarize other documents online with a commissioned online notary.
