Auburn Hills, MI · Oakland County

No notary required

DPW Permit Application

Applicants use this form to request Department of Public Works permits for right-of-way work, utility work, parking lot repaving, or other covered activities.

What this form is

The application requests a permit for construction, operation, use, or maintenance in the city right-of-way, near city utilities or easements, or for other Department of Public Works work such as parking lot repaving. Applicants provide contact and property details and describe the proposed work; plans or drawings are required. The application lists different delivery addresses and plan-copy requirements by permit type.

Who needs it

Residents, businesses, contractors, and other applicants seeking a listed Department of Public Works permit for work in Auburn Hills should complete this application.

How to submit it

Submit the application and plans in paper format. Non-utility applications go to the Department of Public Works at 1500 Brown Road; Metro Act utility applications go to the City Clerk’s Office at 1827 N. Squirrel Road.

About notarization

This document is signed and dated without a notary; the application does not identify any attachment or related step as requiring a notarized or sworn statement.

How to submit this form

  1. 1

    Download The Application

    Download the DPW Permit Application PDF.

  2. 2

    Complete The Application

    Enter applicant, contractor, property, and proposed-work details, then sign and date the application.

  3. 3

    Gather Required Plans

    Include plans or drawings; add a traffic plan for street closures when applicable. Check the form for plan-copy requirements by permit type.

  4. 4

    Submit The Paper Application

    Deliver or mail the application and plans to the city office listed for the selected permit type.

Frequently asked questions

What does the DPW Permit Application cover?
It is used to request permits for construction, operation, use, or maintenance in the city right-of-way, near city utilities or easements, and for listed public works activities such as parking lot repaving.
How do I submit the DPW Permit Application?
Submit the application and plans on paper. The form directs non-utility applications to the Department of Public Works and Metro Act utility applications to the City Clerk’s Office; check the form for addresses and plan-copy requirements.
Do I need a notary for the DPW Permit Application?
No. This application is signed and dated without a notary, and it does not identify an attachment or related step that must be notarized or sworn.
What information and attachments does the application request?
It asks for applicant, contractor, property, and work details. Plans or drawings are required, with the number of copies depending on the permit type; a traffic plan is required for street closures when applicable.

Need something notarized?

This DPW Permit Application doesn’t need a notary — but Michigan residents can notarize other documents online with a commissioned online notary.