Walled Lake, MI · Oakland County

No notary required

Demolition Permit Application

Property owners or their authorized agents and contractors use this application to request a Walled Lake permit for demolition work.

What this form is

The application requests owner and contractor details, the job address, estimated construction value, and permit fee selections. It lists supporting requirements, including written utility shutoff confirmations and an asbestos survey; if asbestos is present, an abatement report is required. It also describes site conditions and inspections required for demolition, and states that the permit is valid for six months.

Who needs it

Property owners or authorized agents applying for demolition work in Walled Lake must complete the application, with the property owner also signing if the applicant is not the owner.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

This application is signed and dated without a notary; the applicant and, if different, the property owner sign.

How to submit this form

  1. 1

    Download the Application

    Download the Demolition Permit Application PDF.

  2. 2

    Complete the Application

    Provide the owner, contractor, job address, estimated construction value, and permit fee selections.

  3. 3

    Gather Required Documents

    Include written utility shutoff confirmations and an asbestos survey; provide an abatement report if asbestos is present.

  4. 4

    Sign and Submit

    The applicant signs and dates the application; the property owner also signs if the applicant is not the owner. Submit it to the city department named on the form.

Frequently asked questions

Do I need a notary for the Demolition Permit Application?
No. The application calls for the applicant to sign and date it; the property owner must also sign if the applicant is not the owner.
How do I submit the Demolition Permit Application?
Submit it to the city department named on the form; check the city website for current contact details.
What information does the demolition application request?
It asks for owner and contractor information, the job address, estimated construction value, and permit fee selections.
What documents does the application require?
The form requires written confirmation of utility shutoffs and an asbestos survey. If asbestos is present, it requires an abatement report.

Need something notarized?

This Demolition Permit Application doesn’t need a notary — but Michigan residents can notarize other documents online with a commissioned online notary.