Marine City, MI · St. Clair County

No notary required

Right of Way Use Permit

This application requests a permit for work in a right of way and is completed by the applicant responsible for the proposed work.

What this form is

The City of Marine City Building Department application covers right-of-way work such as driveways, sidewalks, approaches, and water or sewer taps, which require a separate permit. It asks for applicant and contractor details, work description and location, and estimated start and completion dates. Include a map, three copies of proposed plans, specifications, proof of insurance, a bond, and the listed checklist items.

Who needs it

Applicants planning construction or other work in a Marine City right of way should complete this application and provide the required plans and supporting documents.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

This application is signed and dated without a notary; it lists no notarized or sworn attachment, so the signer just signs and dates it.

How to submit this form

  1. 1

    Download The Application

    Download the Right of Way Use Permit application.

  2. 2

    Complete The Application

    Enter applicant and contractor information, describe the work, provide the project location, and estimate the work dates.

  3. 3

    Gather Required Attachments

    Include a map, three copies of proposed plans, specifications, proof of insurance, and a bond.

  4. 4

    Submit To The City

    Submit the application to the city department named on the form; check the city website for current contact details.

Frequently asked questions

What work does the Right of Way Use Permit cover?
The application lists driveways, sidewalks, approaches, and water or sewer taps. It notes that water or sewer taps require a separate permit.
What must I include with the application?
Include a map, three copies of proposed plans, specifications, proof of insurance, and a bond. The checklist also lists a certificate of insurance, contractor’s license copy, and plans.
Do I need a notary for the Right of Way Use Permit?
No. This application is signed and dated without a notary, and it lists no notarized or sworn attachment.
How do I submit the Right of Way Use Permit?
Submit it to the city department named on the form; check the city website for current contact details.

Need something notarized?

This Right of Way Use Permit doesn’t need a notary — but Michigan residents can notarize other documents online with a commissioned online notary.