Belleville, MI · Wayne County
Building Sign Permit Application
Businesses use this application to seek city approval for a permanent building sign and, optionally, a temporary sign while the permanent sign is pending.
What this form is
The application is for a permanent building sign and must receive Planning Commission approval before a sign permit can be issued; the sign cannot be erected until approval and a building permit are obtained. It asks for business, owner, and sign installer details, sign dimensions and design information, and whether electrical work or a temporary sign is involved. Include the required sign drawings.
Who needs it
A business owner or registered sign installer seeking approval for a permanent building sign should complete this application; temporary sign requests can also be included.
How to submit it
Return pages 2–4 and two copies of a color drawing of the proposed sign to the Building Department. The form states that a permit fee is required with the application.
About notarization
This application is signed and dated without a notary; the signer just signs and dates it.
How to submit this form
- 1
Download The Application
Download the Building Sign Permit Application PDF.
- 2
Complete The Application
Fill in the business, owner, installer, and permanent sign information; complete the temporary sign section if requesting one.
- 3
Gather The Drawings
Prepare two copies of a color drawing showing the sign design, dimensions, scale, date, and proposed location.
- 4
Submit To The Building Department
Return pages 2–4 and the drawing copies to the Building Department with the required permit fee.
Frequently asked questions
- Do I need a notary for the Building Sign Permit Application?
- No. This application is signed and dated without a notary; the signer just signs and dates it.
- How do I submit the Building Sign Permit Application?
- Return pages 2–4 and two copies of a color drawing of the proposed sign to the Building Department. The form says a permit fee is required.
- What should I include with the application?
- Include two copies of a color drawing showing the proposed sign’s design and dimensions. The application requests business, owner, installer, and sign details.
- Can I apply for a temporary building sign?
- Yes. The application includes an optional temporary building sign request. Complete that section and provide the requested sign information and drawing.
