Fairfield, MT · Teton County
Zoning Permit Application and Requirements
Fairfield property owners or authorized representatives use this application to request zoning approval for proposed construction or other work on a property.
What this form is
The application collects the site address, owner and builder information, proposed work details, structure dimensions, construction type, legal description, estimated cost, and planned completion date. Fairfield requires zoning permits to be obtained from the town office and approved by the Public Works Department before construction or work begins. For new buildings, the instructions call for a plot plan showing the proposed construction, existing improvements, setbacks, utilities, and property lines.
Who needs it
Property owners or authorized representatives planning construction or other work in Fairfield need to complete the application and obtain approval before work begins.
How to submit it
Obtain the zoning permit from the town office and have it approved by the Public Works Department before construction or work begins. The document does not provide an address, email, or portal for submitting the application.
About notarization
This document is signed without a notary; the applicant or authorized representative signs and dates the application and plot plan certification.
How to submit this form
- 1
Download The Application
Download the zoning permit application and requirements PDF.
- 2
Complete The Application
Provide the property, owner, builder, proposed work, structure, and legal description information requested.
- 3
Prepare The Plot Plan
For a new building, show the proposed construction, existing improvements, setbacks, utilities, property lines, and other details listed in the instructions.
- 4
Obtain Town Approval
Obtain the permit from the town office and have it approved by the Public Works Department before construction or work begins.
Frequently asked questions
- Do I need a notary for the Fairfield zoning permit application?
- No. The document has signature lines but no notary block; the applicant or authorized representative signs and dates the application and plot plan certification.
- How do I submit the zoning permit application?
- The document says to obtain zoning permits from the town office and have them approved by the Public Works Department before any construction or work begins. It does not list a submission address or online portal.
- What information does the application ask for?
- It asks for property, owner, and builder details, a description and dimensions of the proposed work, construction information, a legal description, estimated cost, and completion date.
- What should I include for new construction?
- The instructions call for a plot plan showing proposed construction, existing improvements, building-site and setback dimensions, easements, utilities, property lines, and survey pins.
