Windsor, NY · Broome County

No notary required

Driveway Building Permit Application

Town of Windsor property owners use this application to request a driveway building permit and arrange an inspection.

What this form is

Use this application to request permission to build a driveway in the Town of Windsor. It asks for the property owner’s contact and mailing details, property location, proposed driveway dimensions and classification, distance from nearby driveways, and directions to the proposed location. Applicants must attach a sketch, stake or flag the driveway location, and agree to follow town design regulations; the permit is valid for six months from approval.

Who needs it

A property owner proposing a residential, commercial, logging, or new driveway in the Town of Windsor should complete this application.

How to submit it

Return the application and sketch to Town Hall. The document lists a $200 driveway permit fee and says the Town Highway Superintendent will contact you to arrange an inspection.

About notarization

This application is signed and dated without a notary; it mentions no notarized or sworn attachment or related step.

How to submit this form

  1. 1

    Download The Application

    Download the Town of Windsor Driveway Building Permit Application.

  2. 2

    Complete The Application

    Provide the owner and property details, proposed driveway dimensions and classification, distance from nearby driveways, and directions to the location.

  3. 3

    Prepare The Sketch

    Attach a sketch showing the property, existing buildings and drives, and the proposed driveway in relation to the Town road.

  4. 4

    Mark The Driveway Location

    Stake or flag the proposed driveway location so the inspector can find it.

  5. 5

    Return It To Town Hall

    Return the application and sketch to Town Hall. The Town Highway Superintendent will contact you to arrange an inspection.

Frequently asked questions

Do I need a notary for the Driveway Building Permit Application?
No. The application has an applicant signature and date line but no notary block, and it mentions no notarized or sworn attachment.
How do I submit the Driveway Building Permit Application?
Return the completed application and required sketch to Town Hall. The Town Highway Superintendent will contact you to arrange an inspection.
What should I attach to the application?
Attach a sketch showing your property, existing buildings and drives on your lot or neighboring lots, and the proposed driveway’s location in relation to the Town road.
Does the driveway location need to be marked?
Yes. The application says to stake or flag the location so the inspector can find it; the Town will not inspect an unmarked driveway.

Need something notarized?

This Driveway Building Permit Application doesn’t need a notary — but if you have another Windsor form that does, a commissioned online notary can help.