Southport, NY · Chemung County

No notary required

Building Permit Application

Property owners, builders, or agents use this application to describe proposed construction or other work and request a building permit from Southport.

What this form is

Use this application to request a building permit and describe the proposed work, its location, estimated cost, and other property details. The form asks for a plot plan and states that workers’ compensation and disability insurance documentation is required before a permit is issued. Stamped architect prints are required for projects costing over $20,000 and for all commercial projects.

Who needs it

Property owners, builders, or agents authorized by an owner use this application to request a permit for proposed work in Southport.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

This application is signed and dated without a notary; the listed insurance and plot-plan materials are attachments, but no notarized or sworn step is stated.

How to submit this form

  1. 1

    Download The Application

    Download the Southport Building Permit Application PDF.

  2. 2

    Complete The Application

    Provide the project location, owner and contractor details, project description, estimated cost, and requested property information.

  3. 3

    Gather Required Materials

    Include the requested plot plan and applicable workers’ compensation and disability insurance documentation; provide stamped architect prints when required.

  4. 4

    Submit To The City

    Submit it to the city department named on the form; check the city website for current contact details.

Frequently asked questions

Do I need a notary for the Southport Building Permit Application?
No. The application asks the owner, builder, or agent to sign and date it; no notarized or sworn step is stated.
How do I submit the Southport building permit application?
Submit it to the city department named on the form; check the city website for current contact details.
What attachments does the application request?
Include a plot plan showing existing and proposed structures, wells or septic systems, the intended work, and distances to lot lines. Insurance documentation is required before permit issuance.
When are stamped architect prints required?
The form says stamped architect prints are required for projects costing over $20,000 and for all commercial projects.

Need something notarized?

This Building Permit Application doesn’t need a notary — but if you have another Southport form that does, a commissioned online notary can help.