Champlain, NY · Clinton County

No notary required

NY State Unified Solar Permit

Property owners and solar contractors use this application to request a building and/or electrical permit for an eligible solar photovoltaic installation in Champlain.

What this form is

This application requests a building and/or electrical permit for an eligible solar photovoltaic installation with a rated DC capacity of 25 kW or less. Applicants confirm the project meets the listed eligibility criteria and provide property, system, contractor, and electrician details. Submit the signed application with the required construction documents and a $25 permitting fee; projects that do not qualify must use conventional permit applications.

Who needs it

Property owners and solar installation contractors seeking permits for eligible solar photovoltaic systems rated at 25 kW DC or less need this application.

How to submit it

Submit the completed application and required attachments by email to [email protected] or in person at the Village of Champlain, 1104 Rt. 9, Champlain, NY 12919. Include the $25 fee, payable by cash or check to the Village of Champlain.

About notarization

This document is signed and dated without a notary; it identifies no attachment or related step that must be notarized or sworn.

How to submit this form

  1. 1

    Download The Application

    Download the NY State Unified Solar Permit application.

  2. 2

    Complete And Sign

    Fill in the property, solar system, contractor, and electrician information, confirm eligibility, and obtain the required signatures and dates.

  3. 3

    Gather Required Attachments

    Include the required construction documents and attachments, along with the $25 permitting fee payable by cash or check.

  4. 4

    Submit To The Village

    Email the completed package to [email protected] or submit it in person at the Village of Champlain, 1104 Rt. 9, Champlain, NY 12919.

Frequently asked questions

Do I need a notary for the NY State Unified Solar Permit?
No. The application asks for the property owner’s and solar installation company representative’s signatures and dates, but it does not require notarization.
How do I submit the Unified Solar Permit application?
Email the completed application and required attachments to [email protected], or submit them in person at the Village of Champlain, 1104 Rt. 9, Champlain, NY 12919. Include the $25 fee.
What projects qualify for the unified solar permit?
The application is for solar PV installations rated at 25 kW DC or less that meet the listed eligibility criteria, including requirements about review, permits, mounting, and contractor compliance.
What must accompany the application?
Submit the completed, signed application, required construction documents and attachments, and a $25 permitting fee payable by cash or check to the Village of Champlain.

Need something notarized?