Philmont, NY · Columbia County
Highway Work Permit Application for Non-Utility Work
This application requests a Village of Philmont highway work permit for non-utility work, including residential or commercial driveway construction and improvements.
What this form is
Use this application to request a permit for non-utility work in the Village of Philmont. It asks for applicant contact information, the work location and requested duration, the type of operation, and a brief work description. Applicants must also provide a sketch plan showing specified roadway, property, driveway, building, and drainage details.
Who needs it
Residents, businesses, and civic groups applying to perform one of the listed types of non-utility work need this application.
How to submit it
Submit it to the city department named on the form; check the city website for current contact details.
About notarization
This application is signed and dated without a notary; the document does not identify any notarized or sworn attachment or related step.
How to submit this form
- 1
Download The Application
Download the Highway Work Permit Application for non-utility work.
- 2
Complete The Application
Enter applicant contact information, work location, requested duration, operation type, and a brief work description.
- 3
Prepare The Sketch Plan
Include the roadway, property, setback, building, driveway, and drainage details requested on the form.
- 4
Submit To The Village
Submit it to the city department named on the form; check the city website for current contact details.
Frequently asked questions
- Do I need a notary for the Highway Work Permit Application?
- No. The application has a signature and date line but no notary block; it does not identify a notarized or sworn attachment or related step.
- How do I submit the Highway Work Permit Application?
- Submit it to the city department named on the form; check the city website for current contact details.
- What information does the application request?
- It asks for applicant contact information, the work location and requested duration, the operation type, and a brief description of the work.
- What should the sketch plan show?
- The sketch plan should show roadway and property features, setback distances, existing or proposed buildings, the driveway location, and existing or proposed drainage structures.
