St. Armand, NY · Essex County

No notary required

Highway Right of Way Permit Application

Property owners, applicants, and contractors use this form to request permission for work in a Town of St. Armand road right of way.

What this form is

The Town of St. Armand Highway Department uses this application to review proposed work in a town road right of way, including driveway, water line, sewer, cable, and other projects. The form says a permit is required and must be approved by the Superintendent of Highways before work begins. Applicants provide project, location, and contractor information, describe the work, add a project sketch, and review the permit conditions.

Who needs it

An entity or applicant planning work in a Town of St. Armand road right of way must obtain approval before starting the project.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

This document is signed and dated without a notary; the applicant and Superintendent of Highways sign, and no notarized attachment or sworn step is specified.

How to submit this form

  1. 1

    Download The Application

    Download the Highway Right of Way Permit Application PDF.

  2. 2

    Complete The Project Details

    Provide applicant, property owner, location, project, contractor, and project date information.

  3. 3

    Add A Project Sketch

    Include a sketch of the project and review the permit conditions.

  4. 4

    Sign And Submit

    Sign and date the application, then submit it to the city department named on the form.

Frequently asked questions

What is the Highway Right of Way Permit Application for?
It requests permission to install or repair items such as a driveway, water line, sewer, cable, or other facility in a Town of St. Armand road right of way.
Who needs to apply for a highway right of way permit?
The form states that any public or private entity wishing to work in a Town road right of way must secure a permit and obtain approval before beginning the project.
Do I need a notary for the Highway Right of Way Permit Application?
No. The document has signature and date lines for the applicant and Superintendent of Highways, but no notary block or notarized attachment is specified.
How do I submit the Highway Right of Way Permit Application?
Submit it to the city department named on the form; check the city website for current contact details.