Hunter, NY · Greene County

No notary required

Unified Residential Solar PV Permit Application

Property owners and solar contractors use this application to request a building and/or electrical permit for an eligible residential solar photovoltaic installation in Hunter.

What this form is

This application requests a unified permit for eligible solar photovoltaic installations with a rated DC capacity of 25 kW or less. It asks about the property, system configuration, owner, contractor, electrician, and eligibility criteria, and requires construction documents and other project-specific attachments. The Town of Hunter states that approval results in a building and/or electrical permit; projects that do not meet the criteria must use conventional permit applications.

Who needs it

Property owners applying for a unified permit for an eligible solar PV installation must complete the application with the solar installation company representative.

How to submit it

Submit the completed application and required construction documents in person at 5748 Route 23a, Tannersville, NY 12485. Include the $100 permitting fee by check payable to The Town of Hunter.

About notarization

This application is signed without a notary; the property owner and solar installation company representative sign and date it.

How to submit this form

  1. 1

    Download The Application

    Download the Unified Residential Solar PV Permit Application PDF.

  2. 2

    Complete And Sign

    Fill in the property, system, contractor, and electrician details, confirm eligibility, and have the property owner and company representative sign and date.

  3. 3

    Gather Required Attachments

    Include the construction documents and any project-specific materials required for the installation type.

  4. 4

    Submit To The Town

    Bring the completed package and $100 check payable to The Town of Hunter to 5748 Route 23a, Tannersville, NY 12485.

Frequently asked questions

Do I need a notary for the Unified Residential Solar PV Permit Application?
No. The application calls for signatures and dates from the property owner and solar installation company representative, but does not require a notary.
How do I submit the solar PV permit application?
Submit the completed application and required construction documents in person at 5748 Route 23a, Tannersville, NY 12485, with the $100 fee by check payable to The Town of Hunter.
What projects qualify for unified solar permitting?
The application lists eligibility criteria including a rated DC capacity of 25 kW or less and no need for a zoning variance or special use permit, among other conditions.
What attachments are required?
The package includes construction documents for the solar PV system and may require roof plans, structural details, or racking-system documentation, depending on the project.

Need something notarized?

This Unified Residential Solar PV Permit Application doesn’t need a notary — but if you have another Hunter form that does, a commissioned online notary can help.