General Building Permit Application

Property owners or their representatives use this application to request building or zoning approval for a project in the Village of Leicester.

What this form is

The application requests approval for a proposed project and asks for applicant, owner, contractor, property, cost, schedule, and project details. The instructions require a completed application, applicable fee, and detailed drawing; plans, a site plan, insurance documents, or other materials may also be required depending on the project. File it at least 10 days before the anticipated start date.

Who needs it

Property owners or their representatives seeking a building or zoning permit for a project in the Village of Leicester should complete this application.

How to submit it

Submit the completed form and attachments with applicable fees to the Village Office. The procedure lists the Code Enforcement Office at 52 South Parkway, PO Box 203, Leicester, NY 14481.

About notarization

This document does not require notarization; the applicant signs and dates it, and no notarized or sworn attachment is identified.

How to submit this form

  1. 1

    Download the Application

    Download the building permit application and review the procedure and fee schedule.

  2. 2

    Complete the Form

    Fill it out completely with applicant, property, contractor, and project information, then sign and date it.

  3. 3

    Gather Required Attachments

    Include a detailed drawing and any project-specific plans, site plan, insurance documents, or certified installer letter required by the instructions.

  4. 4

    Submit to the Village

    Submit the application, attachments, and applicable fee to the Village Office at least 10 days before the anticipated start date.

Frequently asked questions

Do I need a notary for the General Building Permit Application?
No. The applicant signs and dates the application; it does not identify any notarized or sworn attachment.
How do I submit the building permit application?
Submit the completed form, attachments, and applicable fees to the Village Office. The procedure lists the Code Enforcement Office at 52 South Parkway, PO Box 203, Leicester, NY 14481.
What documents may need to accompany the application?
The instructions call for a detailed drawing and, depending on the project, plans or sketches, a site plan, contractor insurance or coverage documents, or a certified installer letter for a factory manufactured home.
When should I file the application?
The procedure says the completed application must be filed at least 10 days before the anticipated project start date.

Need something notarized?

This General Building Permit Application doesn’t need a notary — but if you have another Leicester form that does, a commissioned online notary can help.