Cambria, NY · Niagara County

No notary required

Pool Permit Application

Cambria property owners or contractors use this application to request a permit for an above-ground or in-ground swimming pool.

What this form is

The Pool Permit Application requests information about the jobsite, applicant, property owner, pool type and size, estimated cost, and proposed installation date. It also lists materials required before permit issuance, including a property survey, plans, an electrical permit, and proof of insurance. The document describes pool setbacks, fencing, alarms, inspections, and electrical certification requirements.

Who needs it

Property owners or contractors planning an above-ground or in-ground swimming pool in Cambria can use this application to request a pool permit.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

This application is signed and dated without a notary; the signer certifies the information is true and correct, and no notarized attachment is specified.

How to submit this form

  1. 1

    Download The Application

    Download the Pool Permit Application PDF.

  2. 2

    Complete The Application

    Fill in the jobsite, applicant, owner, pool, electrician, and installation details, then sign and date the application.

  3. 3

    Gather Listed Materials

    Prepare the survey, site or drainage plan, electrical permit, drawings, electronic plans, and proof of insurance listed on the form.

  4. 4

    Submit To The City

    Submit the application to the city department named on the form; check the city website for current contact details.

Frequently asked questions

Do I need a notary for the Pool Permit Application?
No. The application has a signature and date line but no notary block. The signer certifies the information is true and correct; no notarized attachment is specified.
How do I submit the Pool Permit Application?
Submit it to the city department named on the form; check the city website for current contact details.
What information does the application ask for?
It asks for jobsite, applicant and property owner details, pool type and size, estimated cost, installation date, and electrician information.
What materials are listed before permit issuance?
The form lists a property survey showing pool placement, a site or drainage plan, an electrical permit, drawings and plans, an electronic copy of the plans, and proof of insurance.

Need something notarized?

This Pool Permit Application doesn’t need a notary — but if you have another Cambria form that does, a commissioned online notary can help.