Deerfield, NY · Oneida County
Storm Water Control Permit
Deerfield property owners use this application to request a storm water control permit for culvert or other work on a town road.
What this form is
The Storm Water Control Permit application records property and applicant details, the nature and location of the work, and specifications such as driveway width, culvert dimensions, and basin information. Applicants sign and date the form, and the listed permit fee is $35. The form is for work identified as culvert or other work on a town road.
Who needs it
A property owner or applicant planning culvert or other work on a town road in Deerfield should complete this permit application.
How to submit it
Send the permit application and a check to the Town of Deerfield Highway Department, 6892 State Route 8, Deerfield, NY 13502. The form lists a $35 permit fee.
About notarization
This permit is signed and dated without a notary; the form does not identify any notarized attachment or related step.
How to submit this form
- 1
Download The Application
Download the Storm Water Control Permit application.
- 2
Complete The Form
Provide the requested property, contact, road, culvert or basin, and work details.
- 3
Sign And Date
Sign and date the applicant line on the form.
- 4
Prepare The Check
Include a check for the listed $35 permit fee.
- 5
Mail The Application
Send the application and check to the Town of Deerfield Highway Department at the address on the form.
Frequently asked questions
- Do I need a notary for the Storm Water Control Permit?
- No. The form has applicant and Highway Superintendent signature and date lines, but no notary block or notarized attachment is identified.
- How do I submit the Storm Water Control Permit?
- Send the completed application and a check to the Town of Deerfield Highway Department, 6892 State Route 8, Deerfield, NY 13502. The listed permit fee is $35.
- What information does the application ask for?
- It asks for property tax ID, applicant contact information, work details, town road and frontage, driveway width, culvert specifications, basin information, and a description of the work.
