Forestport, NY · Oneida County
Application for Site Development Plan Review & Approval
Forestport property owners or applicants use this application to request town review and approval of a proposed site development plan.
What this form is
The Town of Forestport uses this application to review proposed site development, including building repair, demolition, renovation, or new construction. It asks for applicant, owner, contractor, and property details; project timing, cost, permits, and description; and information about current and proposed land use and site conditions. A separate scaled plan sketch is required, and Part Two must be completed for renovation or new construction.
Who needs it
Applicants seeking site development plan review and approval in Forestport should complete the application and provide a separate scaled plan sketch.
How to submit it
Return the application to the Town of Forestport Department of Codes, PO Box 137, Forestport, NY 13338. Include the separate scaled plan sketch described on the form.
About notarization
This application is signed without a notary; it requests a separate scaled plan sketch, and the form states no notarized attachment or sworn step.
How to submit this form
- 1
Download The Application
Download the Forestport site development plan review application PDF.
- 2
Complete The Application
Provide the requested applicant, property, project, and site information; complete Part Two when the form calls for it.
- 3
Prepare The Plan Sketch
On a separate sheet, draw a scaled sketch showing the proposed plan, dimensions, lot lines, roads, structures, and listed site features.
- 4
Return It To The Town
Send the application and plan sketch to the Town of Forestport Department of Codes at the address shown on the form.
Frequently asked questions
- What does the Forestport site development plan application ask for?
- It requests applicant, property, owner, and contractor details; project information; current and proposed land uses; and site conditions. A separate scaled plan sketch is also required.
- When must I complete Part Two?
- The form directs applicants to complete Part Two when the request is for modification or renovation of an existing building, or construction of a new building.
- Do I need a notary for the Forestport site development plan application?
- No. This application is signed without a notary; it requests a separate scaled plan sketch, and the form states no notarized attachment or sworn step.
- How do I submit the Forestport site development plan application?
- Return it to the Town of Forestport Department of Codes, PO Box 137, Forestport, NY 13338, with the separate scaled plan sketch described on the form.