What this form is

The Town of Forestport uses this application to review proposed site development, including building repair, demolition, renovation, or new construction. It asks for applicant, owner, contractor, and property details; project timing, cost, permits, and description; and information about current and proposed land use and site conditions. A separate scaled plan sketch is required, and Part Two must be completed for renovation or new construction.

Who needs it

Applicants seeking site development plan review and approval in Forestport should complete the application and provide a separate scaled plan sketch.

How to submit it

Return the application to the Town of Forestport Department of Codes, PO Box 137, Forestport, NY 13338. Include the separate scaled plan sketch described on the form.

About notarization

This application is signed without a notary; it requests a separate scaled plan sketch, and the form states no notarized attachment or sworn step.

How to submit this form

  1. 1

    Download The Application

    Download the Forestport site development plan review application PDF.

  2. 2

    Complete The Application

    Provide the requested applicant, property, project, and site information; complete Part Two when the form calls for it.

  3. 3

    Prepare The Plan Sketch

    On a separate sheet, draw a scaled sketch showing the proposed plan, dimensions, lot lines, roads, structures, and listed site features.

  4. 4

    Return It To The Town

    Send the application and plan sketch to the Town of Forestport Department of Codes at the address shown on the form.

Frequently asked questions

What does the Forestport site development plan application ask for?
It requests applicant, property, owner, and contractor details; project information; current and proposed land uses; and site conditions. A separate scaled plan sketch is also required.
When must I complete Part Two?
The form directs applicants to complete Part Two when the request is for modification or renovation of an existing building, or construction of a new building.
Do I need a notary for the Forestport site development plan application?
No. This application is signed without a notary; it requests a separate scaled plan sketch, and the form states no notarized attachment or sworn step.
How do I submit the Forestport site development plan application?
Return it to the Town of Forestport Department of Codes, PO Box 137, Forestport, NY 13338, with the separate scaled plan sketch described on the form.