Hannibal, NY · Oswego County

No notary required

NY State Unified Solar Permit Application

Property owners and solar contractors use this application to request a unified solar permit for eligible photovoltaic installations in Hannibal.

What this form is

The application is for solar photovoltaic installations rated at 25 kW DC or less that meet the listed eligibility criteria. Hannibal requires the completed application and supporting construction documents for eligible projects; projects that do not qualify must use conventional permit applications. It asks about project eligibility, the property, system configuration, owner, contractor, and electrician, and requires signatures.

Who needs it

Property owners applying for an eligible solar installation and their solar installation company representative complete and sign the application.

How to submit it

Submit the completed application and required construction documents electronically to [email protected] or in person at 824 County Route 34, Tuesday or Thursday from 9:00 am to 12:00 pm. The form lists a $50.00 permitting fee payable to the Town of Hannibal by cash or check.

About notarization

This document is signed without a notary; the property owner and solar installation company representative sign and date it, and no notarized or sworn attachment is stated.

How to submit this form

  1. 1

    Download The Application

    Download the NY State Unified Solar Permit Application PDF.

  2. 2

    Complete And Sign The Form

    Fill in the project, property, system, owner, contractor, and electrician information, then obtain the required signatures and dates.

  3. 3

    Gather Required Documents

    Include the required construction documents and any applicable attachments listed in the application.

  4. 4

    Submit To Hannibal

    Email the application and documents to [email protected] or submit them in person at the address and times listed on the form.

Frequently asked questions

Do I need a notary for the NY State Unified Solar Permit Application?
No. The application asks the property owner and solar installation company representative to sign and date it; it does not state that a notary or notarized attachment is required.
How do I submit the NY State Unified Solar Permit Application?
Submit the completed application and required construction documents by email to [email protected] or in person at 824 County Route 34 on Tuesday or Thursday from 9:00 am to 12:00 pm.
Which solar projects can use this application?
The unified process is for systems rated at 25 kW DC or less that meet the application’s eligibility criteria. Projects that do not qualify must use conventional permit applications.
What documents and fee are required?
The application lists the completed, signed form and required construction documents as submittals. It also lists a $50.00 permitting fee, payable to the Town of Hannibal by cash or check.

Need something notarized?

This NY State Unified Solar Permit Application doesn’t need a notary — but if you have another Hannibal form that does, a commissioned online notary can help.