New Haven, NY · Oswego County

No notary required

Unified Solar Permit Application

Property owners and solar contractors use this application to request building and electrical permits for eligible solar photovoltaic installations in New Haven.

What this form is

The application requests a unified solar permit for eligible solar photovoltaic systems with a rated DC capacity of 25 kW or less. It asks about project eligibility, the property and system configuration, and owner and contractor details and signatures. Applicants must include construction documents and any required supporting materials; projects that do not meet the criteria must use conventional permit applications.

Who needs it

Property owners applying for a qualifying solar PV installation and the solar installation contractor or company representative who signs the application need this form.

How to submit it

Email the completed application and required attachments to [email protected], or submit them in person at 4279 State Route 104, New Haven, NY 13121, during the listed business hours.

About notarization

This document is signed and dated without a notary; the property owner and solar installation company representative sign it, and no sworn or notarized attachment is specified.

How to submit this form

  1. 1

    Download The Application

    Download the Unified Solar Permit Application PDF.

  2. 2

    Complete The Application

    Fill in the eligibility responses, property and system details, and contractor information; obtain the required signatures and dates.

  3. 3

    Gather Required Attachments

    Include the required construction documents and any supporting materials specified for your solar PV system.

  4. 4

    Submit To The Town

    Email the completed package to [email protected] or submit it in person at the address and during the hours listed on the form.

Frequently asked questions

Who uses the Unified Solar Permit Application?
Property owners and solar installation contractors use it to apply for permits for eligible solar PV installations in New Haven. Both the property owner and a company representative sign the application.
What must be included with the application?
The application instructions call for required construction documents and supporting materials for the solar PV system. The listed requirements vary by system type; the application also describes eligibility criteria.
Do I need a notary for the Unified Solar Permit Application?
No. The property owner and solar installation company representative sign and date this application; it does not specify a sworn or notarized attachment.
How do I submit the Unified Solar Permit Application?
Email the completed application and required attachments to [email protected], or submit them in person at 4279 State Route 104, New Haven, NY 13121, during the business hours listed on the form.

Need something notarized?

This Unified Solar Permit Application doesn’t need a notary — but if you have another New Haven form that does, a commissioned online notary can help.