Volney, NY · Oswego County

No notary required

Septic System Permit Application

Property owners or their agents use this application to request a Town of Volney building permit for a new septic installation or septic system repair.

What this form is

This building permit application covers new septic installations and repairs in the Town of Volney. Before construction begins, applicants must submit the application and a stamped letter approving the septic design plans from the Oswego County Health Department, including deep hole and percolation test results. The form requests property, owner, work, value, and contractor information.

Who needs it

Property owners or their agents applying for a building permit for a new septic installation or septic system repair in Volney need this application.

How to submit it

Complete the application and submit it to the Code Enforcement Officer at 1445 County Route #6, Fulton, NY 13069. Contractor insurance proof must be faxed or brought in with the application.

About notarization

This application is signed without a notary; a non-owner applicant must include the owner’s affidavit authorizing the work and entry, but no notarization is specified.

How to submit this form

  1. 1

    Download The Application

    Download the septic system permit application for a new installation or repair.

  2. 2

    Complete The Application

    Fill in the property, owner, proposed work, estimated value, applicant, and contractor information.

  3. 3

    Gather Required Documents

    Include the stamped design-plan approval letter and provide contractor insurance proof as instructed.

  4. 4

    Submit To The Town

    Submit the completed application to the Code Enforcement Officer at the address listed on the form.

Frequently asked questions

Do I need a notary for the septic permit application?
No. The application is signed without a notary. A non-owner applicant must include the owner’s affidavit authorizing the work and entry; the form does not specify notarization.
How do I submit the septic permit application?
Submit the completed application to the Code Enforcement Officer at 1445 County Route #6, Fulton, NY 13069. The form says contractor insurance proof must be faxed or brought in.
What must accompany the septic application?
The application requires a stamped letter approving the septic design plans from the Oswego County Health Department, including deep hole and percolation test results. Contractor information and insurance proof are also required.

Need something notarized?

This Septic System Permit Application doesn’t need a notary — but if you have another Volney form that does, a commissioned online notary can help.