NY State Unified Solar Permit Application

Property owners and solar contractors use this application to request a unified permit for eligible non-commercial solar PV installations in the Town of Butternuts.

What this form is

This application requests a unified solar permit for an eligible non-commercial solar PV system with a capacity of 25 kW or less. It asks about project eligibility, the property, system configuration, and owner and contractor details; applicants must also provide construction documents and required attachments. The instructions list a $50 fee and explain that projects outside the eligibility criteria must use conventional permit applications.

Who needs it

Property owners applying for a unified permit for an eligible non-commercial solar PV installation must complete the application and provide the required project documents.

How to submit it

Submit electronically to [email protected], in person at 1234 State Highway 51, Gilbertsville, or by mail to PO Box 318, Gilbertsville NY 13776. Include the $50 fee, payable by cash or check to Town of Butternuts.

About notarization

This application is signed and dated without a notary; no notarized attachment or related step is specified.

How to submit this form

  1. 1

    Download The Application

    Download the NY State Unified Solar Permit Application for the Town of Butternuts.

  2. 2

    Complete The Application

    Answer the eligibility questions and provide the property, solar system, owner, and contractor information requested.

  3. 3

    Gather Required Documents

    Attach the required construction documents and applicable supporting materials listed in the application.

  4. 4

    Submit To The Town

    Send the completed application and $50 fee to the Town Clerk by email, in person, or by mail.

Frequently asked questions

Do I need a notary for the Unified Solar Permit Application?
No. The application asks the property owner and solar installation company representative to sign and date it; it does not specify a notarized attachment or step.
How do I submit the Butternuts solar permit application?
Submit it by email to [email protected], in person at 1234 State Highway 51, Gilbertsville, or by mail to PO Box 318, Gilbertsville NY 13776.
What attachments are required?
Include construction documents for the solar PV system and the applicable attachments listed in the application. Roof-mounted systems have additional roof plan and construction drawing requirements.
What is the application fee?
The application instructions list a $50 fee, payable by cash or check made payable to Town of Butternuts.