Corinth, NY · Saratoga County

No notary required

Minor Subdivision Application

Property owners or their agents use this application to seek Planning Board review of a minor subdivision of three lots or fewer in the Town of Corinth.

What this form is

This application starts preliminary and final review of a minor subdivision, defined in the document as three lots or fewer. It requests applicant, property, surveyor, and engineer information, along with a narrative and subdivision details; submission materials include environmental assessment forms and a preliminary plat. The document lists submission requirements, a Planning Board deadline, and subdivision fees.

Who needs it

Property owners or their agents proposing to subdivide land into three lots or fewer in the Town of Corinth should use this application.

How to submit it

Submit the application and required materials to the Planning Department at least ten days before the Planning Board meeting, with eight copies of the application and required materials. Email PDF files to [email protected]; the listed fee is $100 for the first lot plus $50 for each additional lot.

About notarization

This document is signed without a notary; the property owner or agent signs and dates it, and no notarized or sworn attachment is specified.

How to submit this form

  1. 1

    Download The Application

    Download the Town of Corinth Minor Subdivision Application PDF.

  2. 2

    Complete The Application

    Provide the requested applicant, property, professional, and subdivision information, and sign and date the application.

  3. 3

    Gather Required Materials

    Prepare the required copies of the application, environmental assessment forms, preliminary plat, and any other applicable materials.

  4. 4

    Submit To The Planning Department

    Submit materials at least ten days before the Planning Board meeting and email PDF files to [email protected].

Frequently asked questions

Do I need a notary for the Minor Subdivision Application?
No. This document is signed without a notary; the property owner or agent signs and dates it, and no notarized or sworn attachment is specified.
How do I submit the Minor Subdivision Application?
Submit it and the required materials to the Planning Department at least ten days before the Planning Board meeting. Email PDF files to [email protected].
What is the listed minor subdivision fee?
The application lists a fee of $100 for the first lot plus $50 for each additional lot.
What materials are required with the application?
The document calls for eight copies of the completed application, environmental assessment forms, and a preliminary plat, along with other listed submission materials.

Need something notarized?

This Minor Subdivision Application doesn’t need a notary — but if you have another Corinth form that does, a commissioned online notary can help.