Property owners, applicants, or contractors use this application to request a Town of Moreau permit to install or relocate a manufactured home.

What this form is

The application requests a permit for a new manufactured home installation or relocation and requires approval before construction activities begin. It asks for site, owner, contractor, and home details, along with plans, installation documents, energy-code information, inspection approval, installer certification, and insurance documents. Two physical copies of the required information must be provided, and the fee is collected when the application is approved.

Who needs it

A property owner, applicant, or contractor seeking approval to install or relocate a manufactured home in Moreau needs this application.

How to submit it

Provide two physical copies of the application and required information to the Moreau Building and Zoning Department at 351 Reynolds Road, Moreau, NY 12828.

About notarization

This application is signed and dated without a notary; it lists insurance exemption affidavits among possible supporting documents but does not state that they must be notarized.

How to submit this form

  1. 1

    Download the Application

    Download the Manufactured Home Installation Permit Application.

  2. 2

    Complete the Application

    Fill in the site, owner, contractor, permit type, and manufactured home information, then sign and date the application.

  3. 3

    Gather Required Documents

    Prepare two physical copies of the required plans, manuals, inspection approval, installer certification, and insurance documents.

  4. 4

    Submit to the Town

    Provide the two physical copies to the Moreau Building and Zoning Department at 351 Reynolds Road, Moreau, NY 12828.

Frequently asked questions

Do I need a notary for the Manufactured Home Installation Permit Application?
No. The application has signature and date fields but no notary block. It lists insurance exemption affidavits as possible supporting documents without stating that they must be notarized.
How do I submit the Manufactured Home Installation Permit Application?
Provide two physical copies of the application and required information to the Moreau Building and Zoning Department at 351 Reynolds Road, Moreau, NY 12828.
What documents must accompany the application?
The listed requirements include the manufacturer’s installation manual, detailed drawings, energy-code compliance information, a plot plan, electrical inspection approval, installer certification, and insurance documents.
When is the permit fee collected?
The application states that the fee is collected when the application is approved.