Victory, NY · Saratoga County

No notary required

Residential or Commercial Building Sewer Application

Property owners or their agents use this application to request a permit to install and connect a building sewer in the Village of Victory.

What this form is

This application requests a Village of Victory permit to install and connect a sewer serving a residence or commercial building. It asks for property and applicant details, proposed fixtures, the maximum number of users, contractor information, sewer plans, drainage details, and insurance certificates. Applicants must submit three copies with attachments at least two weeks before the planned work and pay the stated filing fee.

Who needs it

A property owner or owner’s agent seeking permission to install and connect a sewer for a residence or commercial building needs this application.

How to submit it

Submit three copies of the application and all attachments at least two weeks before you want work to start. The form states that the $200 application fee is due at filing.

About notarization

This document is signed and dated without a notary; the signer just signs and dates it, and the listed plans and insurance certificates are attachments, not notarized statements.

How to submit this form

  1. 1

    Download The Application

    Download the Residential or Commercial Building Sewer Application.

  2. 2

    Complete The Application

    Provide the property, applicant, fixture, contractor, drainage, and insurance details requested.

  3. 3

    Gather Attachments

    Attach the proposed sewer plans and specifications and applicable insurance certificates.

  4. 4

    Submit To The Village

    Submit three copies and all attachments at least two weeks before work is planned, with the $200 application fee due at filing.

Frequently asked questions

Do I need a notary for the Building Sewer Application?
No. The application has a signature and date line but no notary block; the signer signs and dates it. Plans and insurance certificates are listed as attachments.
How do I submit the Building Sewer Application?
Submit three copies of the application and all attachments at least two weeks before the planned work. The form says the $200 application fee is due when filing.
What attachments does the application request?
The form asks for plans and specifications for the proposed building sewer and applicable insurance certificates for the contractor or applicant.
What information does the application ask for?
It asks for property and applicant details, proposed fixtures and their users, contractor information, drainage locations, and insurance information.

Need something notarized?

This Residential or Commercial Building Sewer Application doesn’t need a notary — but if you have another Victory form that does, a commissioned online notary can help.