Morristown, NY · St. Lawrence County
Sewage Treatment System Permit Application
This application packet is for Morristown property owners seeking a construction permit and approval for a new or replacement sewage treatment system.
What this form is
The packet guides property owners through applying for a Town of Morristown construction permit for a new or replacement sewage treatment system. It includes a replacement-system status determination, construction permit application, soil and site testing instructions, and system requirements. The packet says to submit the completed application and soil and site data sheets before construction; the Town issues a certificate of acceptance after a satisfactory final inspection.
Who needs it
Property owners proposing a new or replacement sewage treatment system in Morristown need to complete the applicable application materials and obtain an approved construction permit before installation.
How to submit it
Complete the Construction Permit Application and submit it with the Soil & Site Data Sheets to the Town of Morristown; the packet lists 604 Main St., P.O. Box 240, Morristown, NY 13664. It lists a $50 fee for a new or replacement system.
About notarization
This document is signed without a notary; the owner signs and dates the application and replacement-system status form.
How to submit this form
- 1
Download The Packet
Download the Sewage Treatment System Permit Application packet and review the instructions for a new or replacement system.
- 2
Complete The Application
Fill out the applicable permit form and, for a replacement system, the Determination of Status form.
- 3
Gather Soil And Site Materials
Arrange for required soil testing and obtain completed Soil & Site Data Sheets; approved subdivision lots may not need these sheets.
- 4
Submit To The Town
Submit the Construction Permit Application and Soil & Site Data Sheets to the Town of Morristown before construction.
Frequently asked questions
- Do I need a notary for the Sewage Treatment System Permit Application?
- No. This document is signed without a notary; the owner signs and dates the application and replacement-system status form.
- How do I submit the Sewage Treatment System Permit Application?
- Submit the completed Construction Permit Application with the Soil & Site Data Sheets to the Town of Morristown. The packet lists 604 Main St., P.O. Box 240, Morristown, NY 13664.
- What materials does the application packet require?
- The packet instructs applicants to submit the Construction Permit Application and Soil & Site Data Sheets. Soil testing is not needed for lots in an approved subdivision when the information is on file with the Town.
- When can system construction begin?
- The packet says installation may proceed only when you have an approved Construction Permit. It also directs applicants to notify the Town at least 24 hours before a final inspection.
Need something notarized?
This Sewage Treatment System Permit Application doesn’t need a notary — but if you have another Morristown form that does, a commissioned online notary can help.
