Waddington, NY · St. Lawrence County

No notary required

Unified Solar Permit

The Town of Waddington uses this application for eligible solar photovoltaic projects, filed by property owners and solar installation contractors seeking a building or electrical permit.

What this form is

This application requests a unified permit for eligible solar photovoltaic systems rated at 25 kW DC or less. It asks about the property, owner, contractor, electrician, system capacity, configuration, and eligibility, and requires supporting construction documents. The form says applicants whose projects do not meet the eligibility criteria must use conventional permit applications; the town issues a permit determination after receiving a complete and accurate application.

Who needs it

Property owners and solar installation contractors proposing an eligible solar photovoltaic installation in Waddington should complete and submit this application.

How to submit it

Submit the completed application, required construction documents, and a $25 check payable to the Town of Waddington by mail or in person at 48 Maple Street, Waddington, NY 13694.

About notarization

This document is signed without a notary; the property owner and solar installation company representative sign and date the application.

How to submit this form

  1. 1

    Download The Application

    Download the Unified Solar Permit and review the eligibility criteria and submittal requirements.

  2. 2

    Complete And Sign

    Enter the property, system, contractor, and electrician details, answer the eligibility questions, and have the owner and company representative sign and date.

  3. 3

    Gather Required Documents

    Attach the required construction documents and any applicable supporting materials, such as a diagram or prior approval.

  4. 4

    Submit To The Town

    Send or deliver the application and a $25 check payable to the Town of Waddington to 48 Maple Street, Waddington, NY 13694.

Frequently asked questions

Do I need a notary for the Unified Solar Permit?
No. The application has signature and date lines for the property owner and solar installation company representative, but no notary block.
How do I submit the Unified Solar Permit?
Mail or deliver the completed application, required construction documents, and a $25 check payable to the Town of Waddington to 48 Maple Street, Waddington, NY 13694.
Who can use the unified solar application?
It is for eligible solar photovoltaic projects rated at 25 kW DC or less that meet the application’s listed criteria. Projects that do not qualify must use conventional permit applications.
What attachments are required?
Include construction documents for the system type being installed. The application also calls for additional documents in applicable cases, such as a diagram of an accessory structure’s electrical connection.

Need something notarized?

This Unified Solar Permit doesn’t need a notary — but if you have another Waddington form that does, a commissioned online notary can help.