Final Cost of Construction Affidavit
This form reports the actual construction cost and requests a Certificate of Occupancy or Compliance from the Town of Bethel Building Department.
What this form is
The applicant or agent uses this form to report the actual cost of construction and apply for a Certificate of Occupancy or Compliance. It asks for permit and property details, estimated and actual costs, and the signer’s role supervising the work. The applicant states that the work follows the approved plan and applicable law.
Who needs it
An applicant or agent seeking a Certificate of Occupancy or Compliance for construction in Bethel should complete and return this form.
How to submit it
Return the completed form to the Building Department at 454 State Route 55, White Lake, NY 12786, with the $50 fee and any additional permit fee that may have occurred.
About notarization
This document is signed and dated without a notary; it lists no notarized attachment or sworn step, so the applicant signs and dates the form.
How to submit this form
- 1
Download the Form
Download the Final Cost of Construction Affidavit for Bethel.
- 2
Complete the Form
Enter the permit and property details, estimated and actual costs, applicant information, role, date, and signature.
- 3
Prepare the Fee
Include the $50 fee and any additional permit fee that may have occurred.
- 4
Return It to the Building Department
Return the completed form and fee to 454 State Route 55, White Lake, NY 12786.
Frequently asked questions
- Do I need a notary for the Final Cost of Construction Affidavit?
- No. The form provides a date and signature line but no notary block. The applicant signs and dates it; the document lists no notarized attachment or sworn step.
- How do I submit the Final Cost of Construction Affidavit?
- Return the completed form to the Bethel Building Department at 454 State Route 55, White Lake, NY 12786, with the $50 fee and any additional permit fee that may have occurred.
- What information does the affidavit ask for?
- It asks for permit and tax map details, the property location, estimated and actual construction costs, the applicant’s role, and a signature and date.
- Does submitting the form guarantee a Certificate of Occupancy or Compliance?
- No. The form states that a physical inspection is required before the Certificate of Occupancy or Compliance is issued.
Need something notarized?