Groton, NY · Tompkins County

No notary required

Major Subdivision Level 1 Final Application

Property owners or applicants use this application to seek final approval for a major subdivision in the Town of Groton.

What this form is

The application is for a proposed major subdivision seeking final approval from the Town of Groton Planning Board. It requests project, property, lot, land-use, and applicant information, and lists required supporting materials, including an agricultural data statement, an environmental review form, surveys, and construction drawings. The form also provides sections for Planning Board review and determination.

Who needs it

Applicants seeking final approval for a major subdivision in the Town of Groton should complete this application and provide the listed supporting documents.

How to submit it

Mail or bring the completed form, all additionally required documents, and the fee to the Groton Town Clerk’s Office, PO Box 36, 101 Conger Blvd, Groton, NY 13073.

About notarization

This application is signed and dated without a notary; the document lists no notarized or sworn attachment, so the signer just signs and dates it.

How to submit this form

  1. 1

    Download The Application

    Download the Major Subdivision Level 1 Final Application.

  2. 2

    Complete The Application

    Provide the proposed subdivision, property, lot, land-use, applicant, and landowner information requested.

  3. 3

    Gather Required Documents

    Prepare the supporting documents listed on the application, including the required surveys and construction drawings.

  4. 4

    Submit To The Town Clerk

    Mail or bring the form, required documents, and fee to the Groton Town Clerk’s Office.

Frequently asked questions

Do I need a notary for the Major Subdivision Level 1 Final Application?
No. The application has signature and date fields but no notary block. The listed attachments do not require notarization on this form.
How do I submit the Major Subdivision Level 1 Final Application?
Mail or bring the form, required documents, and fee to the Groton Town Clerk’s Office at PO Box 36, 101 Conger Blvd, Groton, NY 13073.
What supporting documents does the application list?
The listed materials include an agricultural data statement, Part One of the State Environmental Quality Review Short Form, proposed subdivision surveys, construction drawings, and other specified plans and information.

Need something notarized?

This Major Subdivision Level 1 Final Application doesn’t need a notary — but if you have another Groton form that does, a commissioned online notary can help.