Groton, NY · Tompkins County
Major Subdivision Level 2 Final Application
This application is for applicants seeking final approval of a major subdivision in the Town of Groton and is submitted with required documents and a fee.
What this form is
Applicants use this form to request final approval of a major subdivision in the Town of Groton. It asks for proposed lots, property and zoning details, land use, subdivision characteristics, and applicant, landowner, and surveyor or engineer information. The form lists supporting materials, including an Ag Data Statement, a SEQR Short Form, proposed surveys, and documents required from preliminary review.
Who needs it
Applicants seeking final approval for a major subdivision in the Town of Groton need to complete this application and provide the listed supporting documents.
How to submit it
Mail or bring the completed form, all additionally required documents, and the fee to Groton Town Clerk’s Office, PO Box 36, 101 Conger Blvd, Groton, NY 13073. The form lists a fee of $100 plus $50 per lot.
About notarization
This document is signed and dated without a notary; it lists no notarized or sworn attachment, so the applicant and landowner sign and date as applicable.
How to submit this form
- 1
Download The Application
Download the Major Subdivision Level 2 Final Application PDF.
- 2
Complete The Application
Fill in the proposed subdivision, property, zoning, applicant, landowner, and surveyor or engineer details.
- 3
Gather Required Documents
Include the documents listed on the form, such as the Ag Data Statement, SEQR Short Form, and proposed surveys.
- 4
Submit To The Town
Mail or bring the application, required documents, and fee to the Groton Town Clerk’s Office at the address on the form.
Frequently asked questions
- What is the Major Subdivision Level 2 Final Application?
- It is an application for final approval of a major subdivision in the Town of Groton. It collects project, property, applicant, landowner, and surveyor or engineer information.
- What documents must accompany the application?
- The form lists an Ag Data Statement, Part One of the SEQR Short Form, proposed subdivision surveys, and other materials, including items or documents required from preliminary review.
- Do I need a notary for the Major Subdivision Level 2 Final Application?
- No. This document is signed and dated without a notary; the form lists no notarized or sworn attachment.
- How do I submit the Major Subdivision Level 2 Final Application?
- Mail or bring the completed form, required documents, and fee to Groton Town Clerk’s Office, PO Box 36, 101 Conger Blvd, Groton, NY 13073.
Need something notarized?
This Major Subdivision Level 2 Final Application doesn’t need a notary — but if you have another Groton form that does, a commissioned online notary can help.
