Briarcliff Manor, NY · Westchester County

No notary required

Excavation Permit Application for Work Within the Village Right of Way

This application requests a permit for excavation or other work in the Village right of way and is completed by the applicant performing the work.

What this form is

The Department of Public Works application covers street openings, utility connections, driveway or curb cuts, and other work in the Village right of way. Applicants must complete the required sections, read the permit conditions, and provide a detailed drawing, insurance documentation, and a Call Before You Dig case number. A field meeting with a Village representative is required before excavation, and listed fees and deposits are completed by Public Works.

Who needs it

An applicant planning excavation, utility work, or other listed work within the Village right of way needs to complete this application.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

This document is signed and dated without a notary; the applicant provides drawings, insurance documentation, and a Call Before You Dig case number, with no notarized attachment specified.

How to submit this form

  1. 1

    Download The Application

    Download the Excavation Permit Application for work within the Village right of way.

  2. 2

    Complete The Application

    Fill in the applicant, work location, contractor, property owner, and proposed work details, and review the conditions before signing.

  3. 3

    Gather Required Documents

    Provide a detailed drawing, insurance documentation, and a Call Before You Dig case number with the application.

  4. 4

    Submit To The Department

    Submit the application to the department named on the form; check the city website for current contact details.

Frequently asked questions

What work does the Excavation Permit Application cover?
It covers work in the Village right of way, including street openings, utility connections, driveway or curb cuts, and other listed work.
What documents and information does the application request?
The application asks for applicant, contractor, property owner, work location, and work details. It also requires a detailed drawing, insurance documentation, and a Call Before You Dig case number.
Do I need a notary for the Excavation Permit Application?
No. The applicant signs and dates this document without a notary. The form requires drawings, insurance documentation, and a Call Before You Dig case number, but does not specify a notarized attachment.
How do I submit the Excavation Permit Application?
Submit it to the city department named on the form; check the city website for current contact details.

Need something notarized?

This Excavation Permit Application for Work Within the Village Right of Way doesn’t need a notary — but if you have another Briarcliff Manor form that does, a commissioned online notary can help.