Pleasantville, NY · Westchester County

No notary required

Petition to Architectural Review Board

Pleasantville applicants use this petition to request building or sign review by the Architectural Review Board and provide project and contact information.

What this form is

This petition requests Architectural Review Board review for a building project or sign in Pleasantville. It asks for the project address, applicant and project professional contact details, submitted materials, and the building owner’s written consent. The form states that six copies of pertinent information are due at least ten days before the scheduled meeting and lists a $75 application fee.

Who needs it

Applicants seeking Architectural Review Board review for a building project or sign must complete the petition and provide the building owner’s written consent.

How to submit it

Submit six copies of the petition and pertinent information to the Building Department, 80 Wheeler Avenue, Pleasantville, NY 10570, at least ten days before the scheduled ARB meeting. The form lists a $75 application fee.

About notarization

This petition is signed without a notary; the building owner must provide written consent, and the applicant signs and dates the certification.

How to submit this form

  1. 1

    Download The Petition

    Download the Architectural Review Board petition PDF.

  2. 2

    Complete The Petition

    Enter the project address, contact information, application type, and other requested details, then sign and date the applicant certification.

  3. 3

    Gather Supporting Materials

    Include six copies of pertinent information and obtain the building owner’s written consent.

  4. 4

    Submit To The Building Department

    Submit the petition and materials to the Building Department at least ten days before the scheduled ARB meeting; the form lists a $75 application fee.

Frequently asked questions

Do I need a notary for the Architectural Review Board petition?
No. This petition is signed without a notary. The building owner must provide written consent, and the applicant signs and dates the certification.
How do I submit the Architectural Review Board petition?
Submit six copies of the petition and pertinent information to the Building Department at 80 Wheeler Avenue, Pleasantville, NY 10570, at least ten days before the scheduled ARB meeting. The form lists a $75 application fee.
What materials should I include with the petition?
The form lists materials such as floor plans, a site plan, elevations, renderings or photos, materials, samples, color swatches, plantings, and lighting fixtures. It also refers applicants to attached submission requirements.
Does the building owner need to consent?
Yes. The form says written consent from the landlord or building owner is required and that the application will not be accepted without it.

Need something notarized?

This Petition to Architectural Review Board doesn’t need a notary — but if you have another Pleasantville form that does, a commissioned online notary can help.