Tuckahoe, NY · Westchester County
Electrical Permit Application Package
Westchester County licensed electricians use this package to apply for a Tuckahoe electrical permit and provide project details and required supporting documents.
What this form is
The package is for applying for a permit to perform electrical installation work in Tuckahoe. It asks for the property and owner details, electrician and company information, proposed work, use type, and project cost and scope. Applicants must include the Electrical Inspection Service Application, required contractor insurance and license documents, and the applicable permit fee; fire alarm installations require four sets of drawings by a licensed architect or engineer.
Who needs it
A Westchester County licensed electrician applying to perform electrical installation work in Tuckahoe needs to complete and submit this package.
How to submit it
Submit the complete application materials and fee together to the Building Department at 65 Main Street, Tuckahoe, NY 10707. The electrical license holder must file in person.
About notarization
This package has no notary block; the Westchester County licensed electrician signs and dates the application, and no notarized attachment is listed.
How to submit this form
- 1
Download The Package
Download the Electrical Permit Application Package and its application and count sheet.
- 2
Complete The Application
Provide the property, owner, electrician, company, proposed work, use type, estimated cost, and scope of work details.
- 3
Gather Required Documents
Include the Electrical Inspection Service Application, contractor license and insurance documents, and any required fire alarm drawings.
- 4
Submit The Complete Package
Submit all application materials and the applicable fee together to the Building Department; the electrical license holder must file in person.
Frequently asked questions
- Do I need a notary for the Electrical Permit Application Package?
- No. This package has no notary block; the Westchester County licensed electrician signs and dates the application, and no notarized attachment is listed.
- How do I submit the Electrical Permit Application Package?
- Submit the completed package, required supporting materials, and fee together to the Building Department at 65 Main Street, Tuckahoe, NY 10707. The electrical license holder must file in person.
- What supporting documents are required?
- The package lists an Electrical Inspection Service Application, an electrical license, liability insurance, workers’ compensation insurance, and disability insurance. Fire alarm installations also require four sets of drawings by a licensed architect or engineer.
Need something notarized?
This Electrical Permit Application Package doesn’t need a notary — but if you have another Tuckahoe form that does, a commissioned online notary can help.
