Zoning / Subdivision Permit Application

Property owners or contractors use this application to request a Rose Hill zoning or subdivision permit before building or changing a structure’s use.

What this form is

The Town of Rose Hill says this application must be completed before building a structure or changing the use of an existing structure. It asks about the purpose of the request, occupancy type, lot size, and exact location, and requires a site plan drawn to scale showing the proposed activity in relation to buildings, property lines, street right-of-way lines, and easements.

Who needs it

Property owners or contractors planning construction or a change in a structure’s use within Rose Hill’s zoning jurisdiction need to complete this application.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

This application is signed and dated without a notary; the form requires a site plan but does not say that any attachment must be notarized or sworn.

How to submit this form

  1. 1

    Download The Application

    Download the Zoning / Subdivision Permit Application PDF.

  2. 2

    Complete The Application

    Describe the request, occupancy type, lot size, and exact location; provide the owner or contractor name, signature, phone number, and request date.

  3. 3

    Prepare The Site Plan

    Include the mandatory site plan drawn to scale, showing the proposed activity in relation to buildings, property lines, street right-of-way lines, and easements.

  4. 4

    Submit To The City

    Submit the application to the city department named on the form; check the city website for current contact details.

Frequently asked questions

Do I need a notary for the Zoning / Subdivision Permit Application?
No. The application is signed and dated without a notary. It requires a site plan, but does not say that the plan or another attachment must be notarized or sworn.
When must I complete this application?
The Town of Rose Hill says to complete a Zoning Permit/Subdivision Permit application before building any structure or changing the use of an existing structure.
What should I attach to the application?
A site plan drawn to scale is mandatory. It must show the proposed activity in relation to other buildings, property lines, street right-of-way lines, and easements.
How do I submit the application?
The form does not provide submission instructions or contact details. Submit it to the city department named on the form and check the city website for current contact details.