Belton, TX · Bell County

No notary required

City Public Rights-of-Way Construction Permit

This permit application is for facility owners seeking approval for construction or other work in public rights-of-way in Belton.

What this form is

The City of Belton requires an approved permit before excavation, construction, installation, maintenance, or other listed work on a person's facilities in the public right-of-way. The application asks for company and contact details, proposed dates, work locations and descriptions, traffic impacts, and materials for backfill and surface replacement. It also includes applicant acknowledgments and city-use sections for review and inspections.

Who needs it

A facility owner or authorized representative must apply before undertaking covered work on facilities in Belton's public rights-of-way.

How to submit it

Return the form to the City of Belton Department of Public Works, Attn: Director of Public Works, P.O. Box 120, Belton, Texas 76513, or email it to [email protected].

About notarization

This document is signed and dated without a notary; the application does not require a notarized or sworn attachment, so the signer just signs and dates it.

How to submit this form

  1. 1

    Download the Application

    Download the City Public Rights-of-Way Construction Permit application.

  2. 2

    Complete the Application

    Enter company and contact details, proposed dates, work location and description, traffic information, and materials.

  3. 3

    Gather Supporting Documents

    Attach additional documentation if necessary or required; the form also asks whether drawings or a plat are submitted.

  4. 4

    Submit to Public Works

    Return the application by mail to the Director of Public Works at the listed address or email it to [email protected].

Frequently asked questions

Do I need a notary for the City Public Rights-of-Way Construction Permit?
No. The application has a signature and date line but no notary block; the signer just signs and dates it.
How do I submit the public rights-of-way permit application?
Return it to the Belton Department of Public Works by mail at the listed P.O. Box or electronically to [email protected].
What information does the application request?
It asks for company and contact information, work dates, work location and details, traffic impacts, and backfill and surface replacement materials.
When must I obtain an approved permit?
The form says an approved permit is required before excavation, construction, installation, or other listed work on facilities in the public right-of-way.

Need something notarized?

This City Public Rights-of-Way Construction Permit doesn’t need a notary — but Texas residents can notarize other documents online with a commissioned online notary.