Hollywood Park, TX · Bexar County

No notary required

Septic Permit Application

Property owners use this application to request approval for a new or modified on-site sewage facility in Hollywood Park.

What this form is

This application requests a permit for new construction or modification of an on-site sewage facility. It asks for property owner and site details, the legal description, water source, building information, and site evaluator, designer, and installer details; it also includes technical information and soil evaluation materials. The document says the application and planning materials must be submitted before construction, and approval is required before work begins.

Who needs it

Property owners seeking approval for new construction or modification of an on-site sewage facility must submit the application and planning materials.

How to submit it

Submit the application and planning materials to City Hall for review by the Designated Representative. The installer must pay the $300 permit fee and $500 deposit before submitting them to the inspector.

About notarization

This document is signed and dated without a notary; the signer just signs and dates it.

How to submit this form

  1. 1

    Download The Application

    Download the Septic Permit Application PDF.

  2. 2

    Complete The Application

    Fill in every application field, including the property legal description; use N/A where a field does not apply.

  3. 3

    Gather Planning Materials

    Include the required plans and supporting materials, such as soil and site evaluations.

  4. 4

    Submit To City Hall

    Submit the application and planning materials to City Hall for review; the installer must pay the listed fee and deposit before submitting them to the inspector.

Frequently asked questions

Do I need a notary for the Septic Permit Application?
No. This application has a signature and date line but no notary block; the signer just signs and dates it.
How do I submit the Septic Permit Application?
Submit the application and planning materials to City Hall for review by the Designated Representative. The installer must pay the listed permit fee and deposit before submitting them to the inspector.
What information does the application ask for?
It asks for owner and property details, the legal description, water source, building information, and site evaluator, designer, and installer details. Technical and soil evaluation materials are also included.
Can construction begin before the application is approved?
No. The document says not to begin construction before application approval and states that authorization to construct must be granted before construction can begin.

Need something notarized?

This Septic Permit Application doesn’t need a notary — but Texas residents can notarize other documents online with a commissioned online notary.