Iowa Colony, TX · Brazoria County

No notary required

Subdivision Plan Review Application

Developers and project contacts use this application to request city review of subdivision plans and provide project, applicant, engineering firm, and owner details.

What this form is

Use this application to submit subdivision plans for review by the City of Iowa Colony. It asks for project and contact information, the class and description of work, lot count, and fee calculations; the listed fee includes a per-lot amount and an engineering-cost calculation for detention and drainage facilities. The form also lists required submittal items and instructions for resubmittals.

Who needs it

Applicants submitting subdivision plans for city review should complete this application and provide the listed supporting materials.

How to submit it

Deliver the application and required items on a flash drive to Iowa Colony; hard copies are not required. Fees are payable to the City of Iowa Colony.

About notarization

This application is signed and dated without a notary; the form does not identify any attachment or related step that must be notarized or sworn.

How to submit this form

  1. 1

    Download The Application

    Download the Subdivision Plan Review Application PDF.

  2. 2

    Complete The Form

    Fill in the project, applicant, engineering firm, and owner information, then sign and date the application.

  3. 3

    Gather The Required Items

    Prepare a copy of the preliminary plat, a construction cost estimate, and fees payable to the City of Iowa Colony.

  4. 4

    Deliver The Submittal

    Deliver the application and required items on a flash drive to Iowa Colony; hard copies are not required.

Frequently asked questions

What is the Subdivision Plan Review Application for?
It gives the city project details and contact information for reviewing subdivision plans, and includes the listed fee calculations and submittal requirements.
How do I submit the application?
Deliver the signed and dated application and the required items on a flash drive to Iowa Colony. The form says hard copies are not required.
Do I need a notary for the Subdivision Plan Review Application?
No. The application is signed and dated without a notary, and the form does not identify any attachment or related step that must be notarized or sworn.
What should I include with my application?
The form lists a copy of the preliminary plat, a construction cost estimate, and fees payable to the City of Iowa Colony, along with the signed and dated application.

Need something notarized?

This Subdivision Plan Review Application doesn’t need a notary — but Texas residents can notarize other documents online with a commissioned online notary.