Contractors or project applicants use this application to request a city permit for subdivision work, including paving, water, sewer, storm drainage, or detention facilities.

What this form is

Use this application to request a permit for subdivision work, including new construction, additions, or reconstruction involving paving, water, sewer, storm drainage, or detention facilities. It asks for project, contractor, engineering firm, and owner details, along with the work description and lot counts used to calculate the listed permit fee. The submittal checklist calls for a final plat, signed plans, and applicable fees.

Who needs it

Applicants seeking a city permit for subdivision work should complete this application and provide the listed plans, plat, and fees.

How to submit it

Deliver the application, a copy of the final plat, signed plans, and fees on a flash or thumb drive to Iowa Colony; the form says hard copies are not required. The form lists fees based on work type and number of lots.

About notarization

This application is signed and dated without a notary; the form lists no sworn attachment or notarized step, so the applicant just signs and dates it.

How to submit this form

  1. 1

    Download The Application

    Download the Subdivision Permit Application PDF.

  2. 2

    Complete The Application

    Fill in the project, work, contractor, engineering firm, and owner information, then sign and date the application.

  3. 3

    Gather The Required Items

    Prepare a copy of the final plat, signed plans, and fees listed for the work type and number of lots.

  4. 4

    Deliver The Submittal

    Deliver the application and listed items on a flash or thumb drive to Iowa Colony; hard copies are not required.

Frequently asked questions

What is the Subdivision Permit Application for?
It requests a city permit for subdivision work such as paving, water, sewer, storm drainage, or detention facilities, and collects project and applicant details.
What must I submit with the application?
The form lists the application, a copy of the final plat, a copy of signed plans, and fees. It says to deliver these items on a flash or thumb drive; hard copies are not required.
Do I need a notary for the Subdivision Permit Application?
No. The application has no notary block or notarized attachment listed; the applicant just signs and dates it.
How do I submit the Subdivision Permit Application?
Deliver the application, final plat, signed plans, and fees on a flash or thumb drive to Iowa Colony. The form states that hard copies are not required.

Need something notarized?

This Subdivision Permit Application doesn’t need a notary — but Texas residents can notarize other documents online with a commissioned online notary.