Jones Creek, TX · Brazoria County
Notification of Proposed Utility Construction
This notification is for a registered user or authorized representative proposing utility construction in the Village of Jones Creek’s rights-of-way.
What this form is
The notification records proposed utility construction in the rights-of-way and asks for project details, an authorized contact, and checkboxes confirming required plans, construction information, insurance and bonding, and permit fee payment. Submit the completed notification at least five working days before construction begins. The form includes spaces for a signature, date, and a permit number assigned by the Village.
Who needs it
A registered user or its authorized representative proposing utility construction in the Village of Jones Creek’s rights-of-way should complete this notification.
How to submit it
Submit it to the city department named on the form; check the city website for current contact details. The form says to submit it at least five working days before construction begins.
About notarization
No notary is required; the notification calls for a signature and date, and lists project attachments but no sworn or notarized attachment.
How to submit this form
- 1
Download The Notification
Download the utility construction notification for proposed work in the Village of Jones Creek’s rights-of-way.
- 2
Complete The Project Details
Describe the project and provide the authorized representative’s name, title, address, phone, and fax.
- 3
Gather The Listed Attachments
Prepare the route drawing or description, construction schedule, two sets of plans, and construction-method description listed on the form.
- 4
Sign And Date The Form
Sign and date the completed notification, and check the boxes that signify compliance.
- 5
Submit To The City
Submit the notification at least five working days before construction begins; check the city website for current contact details.
Frequently asked questions
- Do I need a notary for the right-of-way notification?
- No. The notification calls for a signature and date, and lists project attachments but no sworn or notarized attachment.
- How do I submit the utility construction notification?
- Submit it to the city department named on the form and check the city website for current contact details. The form says to submit it at least five working days before construction begins.
- What attachments does the notification list?
- It lists a drawing or description of the proposed facility route, a construction schedule, two sets of construction plans, and a description of construction and installation methods.
- Who completes the notification?
- The form identifies the Village of Jones Creek as the registered user and asks for the name and title, address, phone, and fax of the person authorized to act for the project.
Need something notarized?
This Notification of Proposed Utility Construction doesn’t need a notary — but Texas residents can notarize other documents online with a commissioned online notary.
