Celina, TX · Collin County

No notary required

Asbestos-Related Statements and Construction Site Waste Consent Form

This form collects asbestos survey or architect/engineer certification information and construction waste acknowledgments from property owners, representatives, and construction project contractors.

What this form is

The form combines asbestos-related statements with a storm water pollution prevention and construction site waste consent form. It asks for project details, asbestos survey or architect/engineer certification information, and signatures; contractors, builders, or developers also initial waste guidelines and provide their names and dates. The asbestos section states that a permit may not be issued without an asbestos survey or architect/engineer certification.

Who needs it

Property owners or authorized representatives and project architects or engineers complete the asbestos section; contractors, builders, or developers complete the construction waste consent section.

How to submit it

The form names the Building and Inspection Services Division and lists 112 N. Colorado Street, Celina, Texas 75009. It also says to transmit an approved copy to the division.

About notarization

This document is signed without a notary; it calls for an asbestos survey or architect/engineer certification as applicable, but does not require either to be notarized.

How to submit this form

  1. 1

    Download The Form

    Download the Asbestos-Related Statements and Construction Site Waste Consent Form.

  2. 2

    Complete The Applicable Sections

    Enter project details and complete the asbestos survey or architect/engineer certification section as applicable.

  3. 3

    Gather The Asbestos Information

    Provide the asbestos survey or architect/engineer certification described in the form, as applicable.

  4. 4

    Submit To The City

    Transmit the approved copy to the Building and Inspection Services Division at the address listed on the form.

Frequently asked questions

Do I need a notary for the Asbestos-Related Statements form?
No. The form is signed without a notary. It calls for an asbestos survey or architect/engineer certification as applicable, but does not require either to be notarized.
Who completes the construction waste consent section?
Contractors, builders, or developers identify their project, initial the construction waste guidelines, and sign and date the consent section.
What does the asbestos section ask for?
It asks whether an asbestos survey has been done or will follow, or provides for an architect/engineer certification concerning asbestos in affected building areas and planned materials.
How do I submit the Asbestos-Related Statements form?
The form names the Building and Inspection Services Division and lists 112 N. Colorado Street, Celina, Texas 75009. It says to transmit an approved copy to the division.

Need something notarized?

This Asbestos-Related Statements and Construction Site Waste Consent Form doesn’t need a notary — but Texas residents can notarize other documents online with a commissioned online notary.